Quay Construction we instructed by We are Ease to take on the ambitious task of conducting a comprehensive overhaul of the popular and beloved Beach Hut restaurant on Watergate Bay beach, all within a tight 5-week timeframe. The project began with a complete stripping down of the structure to identify any necessary structural and waterproofing work. Subsequently, a new glazing system was installed, the entrance layout was reconfigured, and the dining areas were entirely rearranged, featuring banquette tables, a repositioned bar area, and upgraded male, female, and disabled toilets. The interior design underwent a complete revamp, and the external elevations were enhanced.
The end result was a swift and remarkable transformation, providing the Beach Hut team with a more efficient and improved operational space, while also accommodating additional patrons and increasing revenue through added seating capacity.
Quay Construction we instructed by We are Ease to take on the ambitious task of conducting a comprehensive overhaul of the popular and beloved Beach Hut restaurant on Watergate Bay beach, all within a tight 5-week timeframe. The project began with a complete stripping down of the structure to identify any necessary structural and waterproofing work. Subsequently, a new glazing system was installed, the entrance layout was reconfigured, and the dining areas were entirely rearranged, featuring banquette tables, a repositioned bar area, and upgraded male, female, and disabled toilets. The interior design underwent a complete revamp, and the external elevations were enhanced.
The end result was a swift and remarkable transformation, providing the Beach Hut team with a more efficient and improved operational space, while also accommodating additional patrons and increasing revenue through added seating capacity.